91-44-4343-9494
Carnation.jpg

Carnation

  • OVERVIEW
  • AMENITIES
  • SPECIFICATION
  • FLOOR PLAN
  • PROJECT STATUS
  • DOWNLOADS
  • Enquiry Now

Carnation

New Avadi Road - Kilpauk

Block : 1
Floors : B + Stilt + 4 Floors
Bedrooms / Types : 3 BHK – Luxury
No. of Units : 7 Apartments
Status : Ready to Occupy

carnation-logo

Carnation“, consist of 7 Apartments with a Structure of Basement + Stilt + 4 floors is contemporarily designed not just from an external perspective but also in terms of Internal design.

  • 1409640243Air-Conditioned Gym
  • 1409640276Power back-up
  • Association Office
  • Yoga / Multipurpose Hall

STRUCTURE

  • RCC framed structure with RC foundations confirming to BIS.
  • Anti-termite treatment as per BIS for the complete building.
  • All walls with bricks set in cement mortar.
  • 9″ thick brick wall for the outer wall and 4 -1/2′ thickbrick wall for the internal partition wall.

WALL FINISHES

  • Cement plaster and Altech putty finish with Pearl Touch Emulsion for all internal walls.
  • External Walls finished with Weather Shield Max.
  • The toilet walls finished with Joint Free Tiles.
  • Wash area will be finished with Ceramic Tiles upto3-0″ Height.
  • 2′ above the kitchen platform will be finished with double glazed ceramic tiles.

CEILING

  • All ceiling areas will be finished with cement plaster Altec Putty with emulsion.

FLOOR FINISHES

  • Living & Dining will be finished with Engineered Marble/Italian Marble/3’X3′ Vitrified tiles (Rs. 200 per .sq.ft) with matching skirting.
  • Bedrooms will be finished with2’x2′ Double Charged Vitrified tiles with matching skirting.
  • Kitchen will be finished with vitrified matt finish 2’x2’ tiles with matching skirting.
  • Balconies will be finished with Ceramic tiles with matching skirting.
  • Bathroom Flooring &Wash/ Service will be finished with Ceramic Anti – Skid tiles.
  • Lobby and Staircase areas will be finished with Marble/ Granite.
  • Car park areas will be finished with 1’x1′ heavy duty vitrified tile Flooring
  • Columns in the car park will be provided with rubberized edge protection.
  • Driveway will be finished with PCC with Granolithic Flooring/ interlocking Blocks.

DOORS & WINDOW

Main door

  • Panelled Teak Front Main Door.Godrej or Equivalent locks will be provided.

Bedrooms doors

  • All Bedrooms doors will be of Africanteak wood frame with BST/moulded skin paneled door. Godrej or equivalent cylindrical locks will be provided

Toilet doors

  • African teak wood frame with OST/Moulded skin paneled door with one side polish& other side with paint finish.

French doors

  • African teak wood frame with Melamine Polish, shutters fitted with 5mm thick Glass and MS Grills with Enamel Paint.

Windows

  • UPVC windows (Fenesta/Equivalent) and MS Grills as per the Design of the Architect.

KITCHEN

  • Platform will be done with Granite Slabs 2′ wide and provided with Carysil Quartz or equivalent with double bowl. Piped Gas connection to all apartments.
  • Provision for fixing an Exhaust Fan and Aqua Guard will be made.

TOILETS

  • Pastel shade Wall Mount European Water Closets.
  • All CP fittings in bathrooms are of Jaguar/ Parryware Roca or equivalent.
  • Bathroom Health Faucets will be provided.
  • Glass Shower Partition for the Bathroom attached to Master Bedroom.
  • Rain shower for all toilets. Pressure pump for all Showers.

ELECTRICAL

  • Concealed Insulated Copper Multi-strand wires in all Apartments.
  • Each Apartment will be provided with a distribution board having MCB’s.
  • Switches & Sockets of MK /legrand.
  • TV and Telephone Points will be provided in Living and all bedrooms.
  • Electrical Provision for Microwave, Fridge Mixer, Grinder, Aqua guard and Chimney.
  • All Toilets will have electrical provision for connecting a Geyser.

LIFT

  • The building will be served by an eight passenger lift with Automatic door and ARD (Automatic Rescue Device) of “JOHNSON”/Equivalent make.

POWER SUPPLY

  • 3 Phase EB Power Supply, 100% Generator Back –Up with individual meters for all apartments.

SECURITY

  • Lobby Video phone system along with the intercom connection to the security will be provided.

COMMON TOILET

  • Common Toilet for drivers and domestic help.

COMPOUND WALL

  • 5′ high compound wall on all sides of the plot.

LAND SCAPING

  • Landscaping as per architect’s Design.

SUMP

  • One underground RCC sump of adequate capacity for metro water.

BOREWELL

  • One bore well of required depth would be provided.

RAIN WATER HARVESTING

  • As per the requirements of CMWSSB

November 2016

Carnation eBrochure
>> Download

  1. *
  2. *
  3. *
  4. *
  5. *
  6. *
  7. *