91-44-4343-9494
arcade.jpg

Newry Arcade (Commercial)

  • OVERVIEW
  • AMENITIES
  • SPECIFICATION
  • FLOOR PLAN
  • PROJECT STATUS
  • DOWNLOADS
  • Enquiry Now

Newry Arcade (Commercial)

ECR - Panaiyur

Each Shop – 2000 Sq.Ft
No of Shops – 12
Power Backup
CCTV Camera
Landscaping

arcade
  • Each Shop  – 2000 Sq.Ft
  • No of Shops – 12
  • Power Backup
  • CCTV Camera
  • Landscaping
  • sed final24/7 Security
  • cctv finalCCTV
  • 1409640276Power back-up

STRUCTURE

RCC framed structure with RCC foundations confirming to BIS. 
Anti-termite treatment as per BIS for the complete building.
9” thick Brick work for the External wall 
4.5” thick Brick work for all Internal partition wall

WALL FINISHES

Cement plaster white cement primer for all internal walls

External Walls to be finished with Cement Plaster and Exterior Emulsion as per Architect design.

The toilet walls finished with Joint Free Tiles, up-to 7’.0” Height.

Front Elevation and Glass doors as per Architect design.  

Motorized rolling shutter will be provided in Ground floor only

CEILING

All ceiling will be finished with Myk Laticrete/Asian putty.

 

FLOOR FINISHES

Internal office space flooring will be finished with Grano flooring 

Bathroom Flooring will be finished with Ceramic Anti-Skid Tiles. 

Staircase areas will be finished with Grano flooring

Car park areas will be finished with Grano Flooring / Concrete interlocking Paver Blocks as per Architect design. 

Driveway will be finished with PCC with Granolithic Flooring/ interlocking paver Blocks

WINDOWS

UPVC windows as per the Design of the Architect.

TOILETS

All sanitary-ware to be of Kohler or Equivalent
All Toilets CP Fittings are of Jaquar – Continental Range.

PLUMBING

Water /Sewage lines – CPVC / UPVC from Astral / Ashirvad.
PVC Pipes from Finolex / Varun

ELECTRICAL

Concealed Insulated Copper Multi-strand wires in all circuits with a distribution board having MCB’s in all Shops.

Switches & Sockets of Legrand /Anchor.

TV and Telephone conduits will be provided as per Architect drawing 

LIGHTINING ARRESTER

Will be provided as per the design of the electrical consultant  

POWER SUPPLY & GENERATOR

3 Phase EB Power Supply for individual shops 
Generator Back – Up will be provided for common areas. 

SECURITY

CCTV Provided in the common areas as per Architect design. 

COMMON TOILET

Common Toilet for drivers and Maintenance staffs.

COMPOUND WALL

5’ high compound wall on 3 sides of the Property will be provided.

LANDSCAPING

Landscaping as per Architect’s Design. 

SUMP

One underground RCC sump of adequate capacity for metro water

BOREWELL

Two bore wells of required depth will be provided. 

RAIN WATER HARVESTING

As per the requirements of CMWSSB 

SEPTIC TANK

Three common Septic Tank will be provided as per Architects design. 

FUEL TANK

Individual Fuel Tank will be provided below ground level as per Architects design.

Arcade Brochure
>> Download

  1. *
  2. *
  3. *
  4. *
  5. *
  6. *