91-44-4343-9494
celio.jpg

Newry Celio

  • OVERVIEW
  • AMENITIES
  • SPECIFICATION
  • FLOOR PLAN
  • PROJECT STATUS
  • DOWNLOADS
  • Enquiry Now

Newry Celio

Poonamallee – Avadi High Road

Blocks : 2
Bedroom Types : 2 BHK, 2.5 BHK & 3 BHK
No of units : 107
Status : Launching Soon

celio-logo

ASCEND TO AN ADDRESS THAT SHOWS THE WORLD YOU`VE SUCCEEDED.

Newry Celio is more than just a home, it is a statement in modern lifestyle living. A contemporary home, priced smartly to give you a whole new world of living in one of the most successful townships in the area. Upgrade to your new life at Celio – you`ve earned it.

  • 107 premium lifestyle apartments
  • 2, 2.5 & 3 bhk
  • l008 – 1390 sq.ft
  • B + Stilt + 9 Floors
  • 1409640243Well Equipped Gym
  • 1409640276Power back-up
  • Children Play Area
  • Multipurpose Hall

STRUCTURE

  • RCC framed structure with RC foundations confirming to BIS.
  • Anti-termite treatment as per BIS for the complete building.
  • All walls with AAC Block  in cement mortar.
  • 8” thick outer wall and 4’’ thick internal partition wall.

WALL FINISHES

  • Cement plaster and Altech putty finish with Emulsion Paint for all internal walls.
  • The toilet walls will be finished with double glazed ceramic tiles up to 7’ height.
  • Toilets, Kitchen, Balconies and other areas will be finished with cement plaster and Tractor emulsion.
  • Wash area will be finished with Ceramic Tiles up to 3’ height.
  • 2’ above the kitchen platform will be finished with double glazed ceramic tiles.
  • Exterior faces of the building will be finished with cement plaster and Exterior emulsion Paint.

CEILING

  • All ceiling areas will be finished with cement plaster/Gypsum plaster and painted with Tractor Emulsion.

FLOOR FINISHES

  • Living, Dining & Bedrooms will be finished with 2’ x 2’ Vitrified tiles with matching skirting.
  • Kitchen, Balconies, & Toilets will be finished with Non slippery Ceramic Tiles.
  • Wash/service will be finished with Non Slippery Ceramic tiles.
  • All floor lobbies/corridors, staircase will be finished with concrete tiles flooring.
  • Car park areas will be finished with cement concrete granolith flooring.
  • Driveway will be finished with interlocking Blocks.

DOORS & WINDOW

  • Entrance Doors

  • Solid Finger Joined rubber wood frame with finger jointed rubber wood or steam peach wood  panelled door with melamine polish on both sides with Godrej or Yale locks.
  • Bedroom Doors

  • Moulded skin Paneled Doors with Godrej or Yale lock.
  • Toilet Doors

  • Moulded skin Paneled Doors.
  • Windows

  • UPVC windows as per the Design of the Architect. Grills on chargeable basis
  • French Windows

  • UPVC French doors without grills as per the Design of the Architect.

KITCHEN

  • Platform will be done with Granite Slabs 2’ wide and provided with Stainless Steel Single Bowl sink with drain board.
  • Provision for fixing an chimney and Aqua Guard will be made.

TOILETS

  • All sanitary ware will be of Parry ware or Jaquar of white color.

  • All CP fittings will be of Jaquar or Parry ware or equivalent.
  • All toilets will have provision for connecting a Geyser.
  • STP treated water for WC flushing
  • Health Faucets, wall mixer with an overhead shower will be provided in all toilets.

ELECTRICAL

  • Concealed Insulated Copper Multi-strand Fire retardant wires of Q-flex  or Anchor in all Apartments.
  • Each Apartment will be provided with a distribution board having MCB’s.
  • All switches & sockets of  Anchor or Legrand.
  • TV and Telephone Points will be provided in Living and Master bedrooms.

INTERNET

  • Provision given for Internet Connection in Living / Master bedroom .

LIFT

  • The building will be served by one Ten passenger lift and one sixteen passenger lift of Johnson or Schindler make, in each block.

POWER SUPPLY & GENERATOR

  • 3 Phase Power Supply with Generator Back –Up For common lighting, lifts, pumps and for all lighting, fan loads including fridge point  inside apartment.

SECURITY

  • Intercom connection to the security will be provided.

COMMON TOILET

  • Common Toilet for drivers and domestic help would be provided in the stilt floor

COMPOUND WALL

  • 5 feet high compound wall on all sides of the plot.

LANDSCAPING

  • Suitable landscaping shall be done.

SUMP

  • Underground sump of adequate capacity would be provided.

BOREWELL

  • Bore well of required depth would be provided.

RAIN WATER HARVESTING

  • As per the CMDA requirements

OTHER AMENITIES

  • Gymnasium
  • Indoor games
  • Association Room
  • STP
  • Multi-purpose hall

EXTRA WORK

If any additional work is required to be carried out or extra fittings are to be provided, the same will be executed at extra cost after the Allottee approves the estimate for extras and pays the extra cost in Advance.

February 2017

  1. *
  2. *
  3. *
  4. *
  5. *
  6. *
  7. *