91-44-4343-9494
satvik.jpg

Newry Satvik

  • OVERVIEW
  • AMENITIES
  • SPECIFICATION
  • FLOOR PLAN
  • PROJECT STATUS
  • DOWNLOADS
  • Enquiry Now

Newry Satvik

ANNA NAGAR

Block : 1
Floors : Stilt + 3 Floors
Bedrooms / Types : 3 BHK – Luxury
No. of Units : 6 Apartments
Status : Under Construction

satviklogo

Satvik consist of 6 Aesthetic Apartments in a structure of stilt plus 3 floors, 1611 – 1639 Sq.ft, 2 flats in a floor, North & South Facing, Land Extend – 2.19 Grounds.

To Imprint a smile on every Newry Home Owner`s Face

To create aesthetically designed homes with focus on quality & customer satisfaction

STRUCTURE

  • RCC framed structure with RC foundations confirming to BIS.
  • Anti-termite treatment as per BIS for the complete building. All walls with bricks set in cement mortar.
  • 9″ thick brick wall for the outer wall and 4 -1/2′ thick brick wall for the internal partition wall.

WALL FINISHES

  • Cement plaster and JK /Birla putty finish with Pearl Touch Emulsion for all internal walls.
  • External Walls finished with Weather Shield Max.
  • The toilet walls finished with Joint Free Tiles.
  • Wash area will be finished with Ceramic Tiles.
  • 2′ above the kitchen platform will be finished with double glazed ceramic tiles.

CEILING

  • All ceiling areas will be finished with cement /Gypsum plaster.

FLOOR FINISHES

  • Living, Dining & Kitchen will be finished with 3′ x3′ Vitrified tiles
  • Bedrooms will be finished with 2′ x2′ Double charged vitrified tiles with matching skirting
  • Wash & Service will be finished with Ceramic Anti – Skid tiles.
  • Lobby and Staircase areas will be finished with Marble/ Granite.
  • Car park areas will be finished with 1’X1″ Vitrified tile Flooring.
  • Columns in the car park will be provided with rubberized edge protection.
  • Driveway will be finished with PCC with Granolithic Flooring/interlocking Blocks.

DOORS & WINDOW

  • Paneled Teak Front Main Door
  • Godrej or Equivalent locks will be provided.
  • All Bedrooms doors will be of African teak wood frame with BST/Molded skin paneled door. Godrej or equivalent locks will be provided.
  • Toilet doors – African teak wood frame with OST/Molded skin paneled door with one side polish & other side with laminated finish.
  • French doors – African teak wood frame with melamine polish, shutters fitted with 5mm thick glass and MS Grills with Enamel paint.
  • Windows – UPVC window ( Fenesta/Equivalent) with MS Grills as per Design of the Architect.

KITCHEN

  • Provision for basic electrical & plumbing lines.
  • Provision for Piped Gas connection to all apartments.
  • Provision for chimney outlet and Aqua Guard will be made.

TOILETS

  • Kohler wall hung European Water Closets.
  • All CP fittings in bathrooms are of Jaguar / Kohler or Equivalent.
  • Bathroom Health Faucets will be provided.
  • Glass Shower Partition for the Master Bedroom Bathrooms.
  • Rain shower for all toilets & Pressure pump for all Showers.

ELECTRICAL

  • Concealed Insulated Copper Multi-strand wires in all Apartments.
  • Each Apartment will be provided with a distribution board having MCB’s.
  • Switches & Sockets of Legrand/Anchor.
  • TV and Telephone Points will be provided in Living and all bedrooms.
  • Electrical Provision for Microwave, Fridge Mixer, Grinder, Aquaguard and Chimney.
  • All Toilets will have electrical provision for connecting a Geyser.

LIFT

  • The building will be served by an eight passenger lift of Schindler /Johnson or Equivalent make.

POWER SUPPLY & GENERATOR

  • 3 Phase Power Supply with 100% Generator Back – Up with Individual meters for all apartments.

SECURITY

  • Lobby Video phone system along with the intercom connection to the security will be provided.
  • CCTV for common areas in the stilt and terrace area level

COMMON TOILET

  • Common Toilet for drivers and domestic help.

COMPOUND WALL

  • 5′ high compound wall on all sides of the plot.
  • Landscaping as per architect’s Design.

SUMP

  • One underground RCC sump of adequate capacity for metro water.

BOREWELL

  • One bore well of required depth would be provided.

RAIN WATER HARVESTING

  • As per the requirements of CMWSSB.

EXTRA WORK

  • If any additional work is required to be carried out or extra fittings are to be provided, the same will be executed at extra cost after the Allottee approves the estimate for extras and pay the extra cost in Advance.

October 2018

August 2018

March 2018


December 2017

Newry Satvik Brochure
>> Download

  1. *
  2. *
  3. *
  4. *
  5. *
  6. *
  7. *