Newry Square (Commercial)

  • OVERVIEW
  • AMENITIES
  • SPECIFICATION
  • FLOOR PLAN
  • PROJECT STATUS
  • DOWNLOADS
  • Enquiry Now
squarelogo
  • STRUCTURE – STILT + 4 FLOORS
  • FLOOR PLATE – 2075 SQ.FT
  • NO OF FLOORS – 4
  • EXTEND OF LAND – 2.02 GROUNDS
  • UDS – 59 %
  • BUILDING DIMENSION – 72`.4″ X 24`.6″

STRUCTURE

  • RCC framed structure with RC foundations confirming to BIS
  • Anti-termite treatment as per BIS for the complete building.
  • 8″ thick AAC Blocks for the outer wall.
  • 4” thick AAC Blocks for all internal partition wall.

WALL FINISHES

  • Cement plaster white cement primer for all internal walls.
  • External walls to be finished with structural gazing as per architect design
  • The toilet walls finished with Joint free tiles

CEILING

  • Common area ceiling areas will be finished with cement /Gypsum plaster.
  • Office space ceiling area will be finished with MYK Laticrete / Asian putty.

FLOOR FINISHES

  • Internal office space flooring would be finished with Double charged vitrified tiles with matching skirting.
  • Lobby and staircase areas will be finished with granite as per architect design.
  • Car park areas will be finished with 1ft X 1ft heavy duty vitrified tiles
  • Columns in the car park will be provided with rubberized edge protection.
  • Driveway will be finished with PCC Granolithic Flooring/interlocking paver Blocks.

WINDOWS

  • As per the Design of the Architect.

TOILET DOORS

  • Water proof flush door with laminated finish.

TOILETS

  • Kohler wall hung European Water closets.

ELECTRICAL

  • Concealed insulated copper multi-strand wires in all circuits with a distribution board having MCB`s will be provided
  • Switches & Sockets of Legrand / Anchor

LIGHTINING ARRESTER

  • Will be provided as per the design of the electrical consultant

LIFT

  • The building will be served by a 10 passenger lift with automatic door and ARD (automatic Rescue Device) of Schindler/Johnson or equivalent make.

POWER SUPPLY & GENERATOR

  • 3 Phase EB Power Supply with 100% Generator Back –Up with Individual meter would be provided.

SECURITY

  • CCTV provision in the common areas in the stilt and terrace area level

COMMON TOILET

  • Common Toilet for drivers in the stilt level to be provided.

COMPOUND WALL

  • 5 feet high compound wall on all sides of the plot.

LANDSCAPING

  • Landscaping as per architects design.

SUMP

  • One underground RCC sump of adequate capacity for metro water.

BOREWELL

  • One bore well of required depth would be provided.

RAIN WATER HARVESTING

  • As per the requirements of CMWSSB.

EXTRA WORK

  • If any additional work is required to be carried out or extra fittings are to be provided, the same will be executed at extra cost after the Allottee approves the estimate for extras and pay the extra cost in Advance.