91-44-4343-9494
project-banner.jpg

Triton

  • OVERVIEW
  • AMENITIES
  • SPECIFICATION
  • FLOOR PLAN
  • PROJECT STATUS
  • DOWNLOADS
  • Enquiry Now

Triton

Poonamallee Avadi High Road

Block : 1
Floors : Stilt + 4 Floors
Bedrooms / Types : 3 BHK – Luxury
No. of Units : 20 Apartments
Status : Ongoing

triton

20 skillfully crafted 3 bedroom homes in Stilts + 4 Floors in a plot area of 6.54 Grounds with picturesque elevation. The size of the homes vary between 1351-1404 sq. ft. which perfectly fits the affordable housing segment. The 10.02 acres’ Newry Enclave with spacious landscape, calm and tranquil ambiances will bacon Serenity at your home. Tactically located right on the Poonamallee Avadi High Road ensures trouble free Road and Rail connectivity to redefine your lifestyle.

Newry Enclave has ready to use Infrastructure with modern conveniences such Internal 60/40 feet wide well laid roads with street lights, storm water drains, provision for optical fiber connectivity, underground Power supply cabling and two picturesque *scenic park spread over 36000 Sq. Ft.* to be carefully designed and crafted to protect pollution free green milieu, all designed and provided in the Newry Enclave with a insight and futuristic vision makes it encoded. *Life at Paradise Begins Here!*

  • 1409640243Air-Conditioned Gym
  • Association Office
  • Children Play Area
  • 1409640276Power back-up

STRUCTURE

  • RCC framed structure with RC foundations confirming to BIS.
  • Anti-termite treatment as per BIS for the complete building.
  • All walls with bricks set in cement mortar.
  • 8 ft thick outer wall and 4 ft thick internal partition wall.

WALL FINISHES

  • Cement plaster and Altech putty finish with Emulstion Paint for all internal walls.
  • The toilet walls will be finished with double glazed ceramic tiles up to 7′ height.
  • Toilets, Kitchen, Balconies and other areas will be finished with cement plaster and O.B.D.
  • Wash area will be finished wih Ceramic Tiles upto 3’0 height.
  • 2′ above the kitchen platform will be finished with double glazed ceramic tiles.
  • Exterior faces of the building will be finished with cement plaster and Cement Paint.

CEILING

  • All ceiling areas will be finished with cement plaster / gypsum plaster and O.B.D.

FLOOR FINISHES

  • Living, Dining & Bedrooms will be finished with 2 X 2 Vitrified tiles with matching skirting.
  • Kitchen, Balconies, & Toilets will be finished with Non slippery Ceramic Tiles.
  • Wash/service will be finished with Non Slippery Ceramic tiles.
  • All floor lobbies/corridors, staircase will be finished with concrete tiles flooring.
  • Car park areas will be finished with cement concrete granolith flooring.
  • Driveway will be finished with interlocking Blocks.

DOORS & WINDOW

  • Entrance Doors: Solid Finger Joined rubber wood frame with finger jointed rubber wood paneled door with melamine polish on both sides with Godrej or Equivalent locks.
  • Bedroom Doors: Moulded skin Paneled Doors. Godrej or equivalent lock.
  • Toilet Doors: Moulded skin Paneld Doors.
  • Windows: UPVC windows with MS Grills as per the Design of the Architect.
  • French Windows: UPVC French doors without grills, balcony leading to the French door will be covered with MS grills enamel paint as per the Design of the Architect.

KITCHEN

  • Platform will be done with Granite Slabs 2′ wide and provided with Stainless Steel Single Bowl sink with drain board. Provision for fixing an Exhaust Fan and Aqual Guard will be made.

TOILETS

  • Pastel/soft color, European Water Closets of Parryware/equivalent will be provided in all toilets.
  • All toilets will have provision for connecting a Geyser.
  • All sanitary ware will be of parryware / equivalent – pastel/soft color.
  • Health Faucets, wall mixer with an overhead shower will be provided in all toilets.
  • All CP fittings will be of Plumber/Parryware continental range.

ELECTRICAL

  • Concealed Insulated Copper Multi-strand wires in all Apartments.
  • Each Apartment will be provided with a distribution board having MCB’s.
  • All switches & Sockets of MK / Anchor / Legrand.
  • TV and Telephone Points will be provided in Living and Master bedrooms.

Internet

  • Provision given for Internet Connection in Living / Master bedroom.

LIFT

  • The building will be served by an Eight and Ten passenger lift of “JOHNSON” or Equivalent make, 2 Nos.

POWER SUPPLY

  • 3 Phase Power Supply with Generator Back-Up for common lighting, lifts, pumps and for all lighting and fan loads inside apartment.

SECURITY

  • Intercom connection to the security will be provided.

COMMON TOILET

  • Common Toilet for drivers and domestic help would be provided in the stilt floor.

COMPOUND WALL

  • 5′ high compound wall on all sides of the plot.

LAND SCAPING

  • Suitable landscaping shall be done.

SUMP

  • Underground sump of adequate capacity will be provided.

BOREWELL

  • Bore well of required depth would be provided.

RAIN WATER HARVESTING

  • As per the requirements

Other Amenities

  • Gymnasium / Children Play Area / Association Room

Extra Work

  • If any additional work is required to be carried out or extra fittings are to be provided, the same will be executed at extra cost after the Allottee approves the estimate for extras and pays the extra cost in Advance.

February 2018

October 2017

September 2017

May 2017

May 2017

April 2017

February 2017

November 2016

October 2016

September 2016

May 2016

April 2016

E – Brochure
>> Download

  1. *
  2. *
  3. *
  4. *
  5. *
  6. *
  7. *